Heathcote, UK
Day 1 London to Havana
Day 2 Santa Cruz to Matanzas approx. 47km. Our riding starts along the coast road before we turn inland and up hill on the road that takes us through the Yumuri Valley. We continue along the mostly flat valley floor passing farms and ranches. As we reach Matanzas we have a challenging 800 meter long hill to negotiate.
Day 3 Varadero to Zapata approx. 84km We cycle through Matanzas and out to the Carretera Central. Our ride continues thro...